Bad cabinet installs are the #1 reason kitchens look "off" even when everything else is right — drawers rub, doors don't line up, the run isn't level, fillers are uneven. We install custom and stock cabinets to a fine-tolerance standard.
What we install
- Custom cabinetry (built by partner shops, installed by our crew)
- Semi-custom lines (Decora, Schrock, Diamond, KraftMaid)
- Stock cabinets (IKEA Sektion, big-box) — perfectly installed
- Built-ins: media walls, mudrooms, home offices, closet systems
- Bathroom vanities — wall-hung or floor-mount
- Pantry organization with rollouts and pull-outs
How we install
- Laser-level reference line around the entire room before the first cabinet hangs
- Wall studs found and marked; cleats added when needed
- Cabinets shimmed plumb in all directions, screwed together face-frame to face-frame
- Fillers scribed and cut to the wall, not slammed in oversized
- Doors aligned to 1/16" reveal across the run
- Soft-close hinges and runners adjusted on every door and drawer
- Toe-kicks, crown, light rail, and trim returns finished cleanly
Timeline
A standard kitchen takes 3–5 days to install, plus 1–2 days for trim. Built-ins typically finish in 2–4 days.

