Walk-in showers are the single most-requested bathroom upgrade in North Dallas. We've built hundreds — curbed, curbless, frameless glass, steam-rated, you name it.
What's included in every shower we build
- Full waterproof membrane (Schluter Kerdi, Wedi, or equivalent) — not just cement board
- Pre-sloped pan with bonded drain, pressure-tested before tile
- Linear drain option (Schluter Kerdi-Line, Quick Drain, Infinity)
- Tile-ready niche, framed and waterproofed before tile
- Tile bench (floating or with concealed support)
- Curbless / barrier-free entry for aging-in-place when requested
- Frameless glass enclosure measured after tile, fabricated to fit
- Shower valve & trim (Moen, Delta, Kohler, Hansgrohe — your pick)
- Rain head, hand-held, body sprays — full custom plumbing
- Color-matched silicone in change-of-plane joints, urethane grout in wet zones
Glass options
- 3/8" frameless fixed panel + frameless door (most popular)
- 1/2" frameless for large openings
- Sliding barn-door style on rollers
- Steam-shower-rated transom and ceiling seals
Timeline
A standard walk-in shower runs 7–10 working days from demo to glass install (glass is templated after tile, fabricated in 5–7 days). We can stage it so your other bathroom stays usable.

